Basingstoke Hospital

Application
Healthcare
Location
Basingstoke, Hampshire
Service Package
Rapid Rental

BACKGROUND:

A mobile trailer was adapted into a Covid PCR Testing Laboratory.

The staff test 6-7 thousand saliva pots every three weeks.

REQUIREMENT:

Temporary modular steps to replace the existing ones to the trailer. 

The current steps were too steep and narrow, with no handrails and platform.

ADDITIONAL INFORMATION:

CAD and technical drawings were created by our designer in-house. 

END RESULT:

We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.

We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team.  Removal is a service included in our rental package

The steps are fully compliant with documents M & K of the building regulations.

FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.
  • Trombone Ends - these are added to the ends to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.

TEMPORARY STEPS FOR HIRE

Temporary steps are available for short or long-term hire. 

Hire includes:

  • Quotation with 3D CAD drawings of the system
  • Site survey (If applicable)
  • Installation
  • Removal
  • The minimum hire period applies, and the rental duration is flexible (more details available on application).

 

Gallery

THE UK’S EXPERTS IN MODULAR RAMP SYSTEMS.

Rapid Ramp

10 Menzies Road, Ponswood Industrial Estate, St Leonards on Sea, TN38 9BB

Hours:
8am - 5pm, Monday to Friday

Get In Touch